Site Cuts on the Central Coast

How deep a site cut can go on the Central Coast depends on the approval route and the distance from the boundary. Under a complying development certificate it is 1 metre within 1 metre of a boundary, 2 metres up to 1.5 metres in and 3 metres beyond, but never more than 1 metre on Class 3 or 4 acid sulfate land.

Call (02) 4326 8289

Request a free quote

What site cuts on the Central Coast actually involves

A development application is assessed against Council's own controls instead, which generally allow a cut 1 metre deep within 1 metre of a boundary and 3 metres elsewhere, and cap fill for a house at 1 metre. A retaining wall more than 600 millimetres above or below the ground within a metre of a boundary, or more than a metre anywhere else, has to be designed by a professional engineer, and its height counts the part below ground.

A vacant sloping block between two houses, mown grass with timber survey pegs tied with pink tape at its corners — site cuts, Central Coast. Illustrative example.

The land next door, and the slope

NSW law gives land a right of support from the land beside it: a person has a duty of care not to do anything that removes or reduces the support their land gives a neighbour's. SafeWork's excavation code says digging must not start until steps are taken to stop a nearby building or structure collapsing, and a cut below the level of a footing, a retaining wall's included, should be assessed by a competent person.

Where a Council sewer main crosses the block, Council's procedure sets its own limits. A cut must not reduce the earth cover over the main below Council's minimums without specific approval, ground regraded just downslope of a main should be no steeper than 3 horizontal to 1 vertical unless it is certified, and adding more than a metre of fill over a main, or taking it deeper than 3.5 metres, needs Council's approval. Find out where the sewer runs before the cut is designed.

Excavation costs and rules check

Site Cuts on the Central Coast — common questions

Can the cut be left as a sloping bank instead of a wall?

Sometimes. Under Council's controls an unretained bank can be no steeper than the Building Code allows for the soil type, should generally not run more than 3 metres out from the house, and its toe can't be within 1 metre of a side or rear boundary.

Can the soil from the cut be spread over the rest of the block?

Not freely. Earthworks must not send surface water onto a neighbour's land, and on land in Council's flood planning area, filling is restricted and needs Council's approval.

Does a site cut come under a home building contract?

Over $5,000 it is residential building work, so the contract rules apply: a written contract and a deposit of no more than 10%, and above $20,000 a five-day cooling-off period and home building compensation cover, with the certificate given before any payment is taken.

Ready to get your site cuts job quoted?